CNG Station
INTEGRATED MANAGEMENT SYSTEM
Project Development Plan
Project Administration Plan
Design Management Procedures
Safety Management System
Emergency Response Plan
Construction Management Plan
Facility Operations Plan
General Arrangement
Process / Mechanical
Civil
Structural
Electrical
DMP-900 Drawings
General Arrangement - By Change Energy Services Inc.
G-100
Title Page
G-101
Mechanical Legend and General Notes
G-200
Site General Arrangement
MOTHER
G-200.1
Option A – Site General Arrangement
G-200.2
Option B – Site General Arrangement
G-200.3
Option C – Site General Arrangement
DAUGHTER
G-200.10
Site General Arrangement
G-201
Site Elevations
G-202
Site Isometric
Process / Mechanical - By Change Energy Services Inc.
M-100
Mechanical Site Plan
M-101
Equipment Compound General Arrangement
M-102
Dispensing and Defuelling Island General Arrangement
M-103
Indoor Dispensing At Fuelling Room General Arrangement
M-110
Signage
M-210
Site P&ID
M-211
Refuel Gas Control Panel P&ID
M-212
Defuel Gas Control Panel P&ID
M-213
Refuelling Room ESD Control Panel P&ID
M-214
Instrument Air P&ID
M-220
Line List
M-221
Design Calculations
M-230
Component List – Sheet 1 of 5
M-231
Component List – Sheet 2 of 5
M-232
Component List – Sheet 3 of 5
M-233
Component List – Sheet 4 of 5
M-234
Component List – Sheet 5 of 5
M-235
Refuelling Room ESD Gas Control Panel Component List
M-236
Safety Station #1 and Safety Station #2 Component List
M-237
Instrument Air Component List
M-400
Miscellaneous Sections and Details
M-500
Electrically Classified Zones – Plans
Civil - By Change Energy Services Inc.
C-100
Equipment Compound Surface Treatment and Area Calculations
Structural - By
S-100
Structural General Notes and Details
S-200
Structural Plans, Sections and Details
S-300
Structural Pipe Support, Sections and Details
Electrical - By
E-100
Electrical Legend
E-101
Electrical Construction Notes
E-200
Single Line Diagram – Switchgear – 600v
E-201
Single Line Diagram – Power Distribution 1 of 2
E-202
Single Line Diagram – Power Distribution 2 of 2
E-300
GH2 Compound – Electrical Layout
E-301
Electrical Layout – Elevation Details
E-302
Fuelling Room – Electrical Layout Drawing
E-400
PCCM Building Layout
E-401
PCCM Elevation Details
E-500
Grounding and Bonding Layout
E-600
Cable Block Diagram – Sheet 1 of 2
E-601
Cable Block Diagram – Sheet 2 of 2
E-700
Cable and Conduit Schedule – Sheet 1 of 3
E-701
Cable and Conduit Schedule – Sheet 2 of 3
E-702
Cable and Conduit Schedule – Sheet 3 of 3
E-703
Panel Schedules – PCCM BLDG
E-900
Electrical Installation Details – Conduit
E-901
Electrical Installation Details – Grounding
E-902
Electrical Installation Details – Cable Tray Grounding
E-903
Electrical Installation Details – Cable Tray 1
E-904
Electrical Installation Details – Cable Tray 2