BRAMPTON 

NORTH YORK

DETAILED DESIGN DATA SHEETS
DETAILED DESIGN DATA SHEETS
Production Station Detailed Design Data Sheets
Production Station Detailed Design Data Sheets
Decanting Station Detailed Design Data Sheets
Decanting Station Detailed Design Data Sheets
Vehicle Refuelling Station Detailed Design Data Sheets
Vehicle Refuelling Station Detailed Design Data Sheets
STATEMENT OF OWNER’S REQUIREMENTS
STATEMENT OF OWNER’S REQUIREMENTS
DESIGN BASIS MEMORANDUM
DESIGN BASIS MEMORANDUM
PROCESS CONTROL NARRATIVE
PROCESS CONTROL NARRATIVE
COMPRESSIBILITY FACTOR (Z) TABLES
COMPRESSIBILITY FACTOR (Z) TABLES
CHANGE CONTROL (SEE SMS-300)
CHANGE CONTROL (SEE SMS-301)
TECHNICAL STANDARD DEVIATION REQUEST
TECHNICAL STANDARD DEVIATION REQUEST
SAFETY ANALYSES
Hazard Identification & Risk Assessment (HIRA)
Hydrogen Fueling Facilities Risk Assessment (EGI)
Hone DMP-301 HIRA (Trailer only)
Lightning Risk Assessment
Lightning Risk Assessment
HIRA Action Items
HIRA Action Items
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
Computational Fluid Dynamics (CFD)
Computational Fluid Dynamics (CFD)
Safety  Instrumented System (SIS)
Safety  Instrumented System (SIS)
CSA B51 Code Compliance Checklist
CSA B51 Code Compliance Checklist
CSA B401.1-22 Facility Gap Analysis
CSA B401.1-22 Facility Gap Analysis
Reserved for CNG Codes
Reserved for CNG Codes
CHIC Code Compliance Checklist
CHIC Code Compliance Checklist
CGA G-5.5 Hydrogen Vent Systems Code Compliance Checklist
CGA G-5.5 Hydrogen Vent Systems Code Compliance Checklist
CSA/ANSI HGV 4.9  Hydrogen Fueling Stations
CSA/ANSI HGV 4.9  Hydrogen Fueling Stations
Protective Device Coordination Study and Arc Flash Report
Protective Device Coordination Study and Arc Flash Report
APPROVALS
Public
Public
Fire Department
Fire Department
Building Permits
Building Permits
Utilities
Utilities
Site Plan Control
Site Plan Control
Zoning Bylaw Compliance
Zoning Bylaw Compliance
Sign Permits
Sign Permits
TSSA – Technical  Standards and Safety Authority
TSSA – Technical  Standards and Safety Authority
TSSA Application for a Variance Deviation
TSSA Application for a Variance Deviation
Approval Letter
ESA – Electrical Safety Authority
ESA – Electrical Safety Authority
Ministry of the Environment, Conservation and Parks
Ministry of the Environment, Conservation and Parks
Noise Screening Report
Noise Screening Report
MOL – Ministry of Labour
MOL – Ministry of Labour
Pre-Start Health and Safety Review
Pre-Start Health and Safety Review
MTO – Ministry of Transportation
MTO – Ministry of Transportation
Measurement Canada
Measurement Canada
Transport Canada
Transport Canada
EQUIPMENT SPECIFICATIONS
EQUIPMENT SPECIFICATIONS
H2 Certificate Holder
Swagelok Qualifications
Compressor
Compressor
Gas / Air Heat Exchanger
Gas / Air Heat Exchanger
Gas Control Panels
Gas Control Panels
Fill Posts
Fill Posts
Power Control Communications Panel
Power Control Communications Panel
Fuel Management System
Fuel Management System
INSTALLATION SPECIFICATIONS
INSTALLATION SPECIFICATIONS
Installation Drawings
Installation Drawings
GEOTECHNICAL REPORTS
GEOTECHNICAL REPORTS
FACTORY ACCEPTANCE TESTS
FACTORY ACCEPTANCE TESTS
Fill Post
Fill Post
DRAWINGS
DRAWINGS
Process and Mechanical Design Calculations
Process and Mechanical Design Calculations
ENGINEERING DOCUMENTATION REQUIRED CHECKLIST
ENGINEERING DOCUMENTATION REQUIRED CHECKLIST