Markham - TOC
INTEGRATED OPERATION, MAINTENANCE & REPAIR MANAGEMENT SYSTEM
GH2 DESIGN STANDARD
Safety Management System
Emergency Response Plan
Facility Operations Plan
#####
Compliant TOC Procedure
#####
Draft TOC Procedure
#####
No Procedure
#####
EGDS NGV or GH2 procedure
#####
CE CNG or GH2 Procedure
Facility Operations Plan
FOP-100
VEHICLE STATION OPERATIONS & MAINTENANCE
FOP-110
OEM Manuals (
NOTE: Ask LPC for additonal document(s
)
FOP-110.1
Burckhardt Compressor
(ok to use)
FOP-200
RESERVED
FOP-300
RESERVED
FOP-400
STANDARD OPERATING PROCEDURES
FOP-401
Snow Removal in the Station
(Keep for now)
FOP-402
Compressed Gas – Safe Handling, Storage & Disposal Standard (
Keep for now.Ā EGDS is looking for any existing EGDS alternative procedures
)
FOP-403
Air Purge Procedure (
N/A
)
FOP-404
Electrical or Communications Outage (
Keep for now
)
FOP-405
Gas Conservation / Shutdown Procedure (
N/A
)
FOP-406
Collecting Flammable Gas Samples (
Remove, work in progress internally at EGDS
)
FOP-406.1
Hydrogen Gas Sampling Records
FOP-407
Electrolytic Hydrogen Refueling Station (HRS) – Gas Quality Assurance Guideline
FOP-408
Validating Tube Trailer Hardware Compatibility
FOP-408 Form Tube Trailer Registration
FOP-408 TT-#
Customer Name
FOP-409
Validating Hydrogen Truck Operators
FOP-409 Form HTO Registration
FOP-409 TT-#
Customer Name
FOP-410
Validating Drivers
FOP-410 Form Driver Registration
FOP-410 TT-#
Customer Name
FOP-500
STANDARD MAINTENANCE AND REPAIR PROCEDURES
FOP-501
Station Access for Contractors (
Keep it now, EGDS is looking for any existing EGDS alternative procedure)
)
FOP-502
Spark Resistant Tools
FOP-503
Pressure Piping Repair and Air Purge Procedure
(Work in progress internally at EGDS)
FOP-504
Hydrostatic Pressure Testing Procedure for Process Piping (
Work in progress at EGDS)
FOP-505
Pneumatic Pressure Testing Procedure for Process Piping (
Work in progress internally at EGDS)
FOP-600
STANDARD DRIVER PROCEDURES
FOP-601
Vehicle Fuel Dispensing (
Keep for now, EGDS is looking for any existing EGDS alternative procedure
)
FOP-602
Tube Trailer Filling
(Needs as-built info, Needs info from LPC)
FOP-603
Fill Post Leak Check and Air Purge Procedure for Tube Trailer DriversĀ
(Need info from LPC/ANGI)
FOP-700
SHUTDOWN KEY (
Ask LPC to prepare
)
FOP-800 LPC
TRAINING MATERIAL
FOP-801
Certificate Course in Situational Awareness of Hydrogen and Fuel Cell Electric Vehicles
FOP-802 P1
Driver Training – Part 1 Vehicle Refuelling
FOP-802 P2
Driver Training – Part 2 Vehicle Refuelling
FOP-803 P1
Tube Trailer Driver Training – Part 1 Tube Trailer Filling
FOP-803 P2
Tube Trailer Driver Training – Part 2 Tube Trailer Filling
FOP-900 LPC
SPARE PARTS & WARRANTY
FOP-999
Spare Parts Inventory
(EGDS alternative procedure)