Markham - TOC
INTEGRATED OPERATION, MAINTENANCE & REPAIR MANAGEMENT SYSTEM

Compliant TOC Procedure
Not Applicable
No Procedure
EGDS NGV or GH2 procedure
CE CNG or GH2 Procedure
Policy Safety and Reliability
RESERVED
CHANGE CONTROL PROCEDURE (Completed Change Control Reports below)
WORK PROCEDURES
Hazard Assessment and Control Standard
Hazard Assessment and Validation Procedure
Hazard Identification and Risk Assessment
Job Planning
Potential Event (P2+) and Near Miss Event Safety Alert Procedure
Incident Recovery Investigation
Reserved
Contractor Safety Management Standard
WHMIS Standard
Project Execution Permit (PEP) Standard
Hazardous Energy Control Standard
Work Permits
Confined Space Standard (N/A)
Pipe Excavation Standard
Audit
GDS EHS Training Standard
HR Policy Respectful Workplace, Violence, Harassment Policy
Weather Management Standard
Working Near or Over Water (N/A)
Driver Safety Standard
Emergency Safety Equipment Standard
PPE Standard
PPE Fall Protection Guide
Hearing Loss Prevention Standard
Machine Guarding (N/A – Placeholder)
Electrical Work Procedure (N/A)