Compliant TOC Procedure
Not Applicable
No Procedure
EGDS NGV or GH2 procedure
CE CNG or GH2 Procedure
DETAILED DESIGN DATA SHEETS
Production Station Detailed Design Data Sheets
Decanting Station Detailed Design Data Sheets
Vehicle Refuelling Station Detailed Design Data Sheets
STATEMENT OF OWNER’S REQUIREMENTS
DESIGN BASIS MEMORANDUM
PROCESS CONTROL NARRATIVE (P85805-C-203)
COMPRESSIBILITY FACTOR (Z) TABLES
CHANGE CONTROL (SEE SMS-300)
TECHNICAL STANDARD DEVIATION REQUEST
SAFETY ANALYSES
H2 Refueling Station and Compressor HAZOP V3.0
HIRA Action Items
Quantitative Risk Assessment (QRA)
Failure Mode Effect Analysis (FMEA)
Computational Fluid Dynamics (CFD)
Safety  Instrumented System (SIS)
CSA B51 Code Compliance Checklist
CSA B401.1-22 Facility Gap Analysis
Reserved for CNG Codes
CHIC Code Compliance Checklist
CGA G-5.5 Hydrogen Vent Systems Code Compliance Checklist
CSA/ANSI HGV 4.9 Hydrogen Fueling Stations
Protective Device Coordination Study and Arc Flash Report
Lightning Protection Assessment
Photometric Study
APPROVALS
Public
Notice of Meetings
Municipal
Permits and Approvals
Building Permit
Official Plan Compliance
Sewer – Sanitary
Sewer -Storm
Sign Permits
Site Plan Control
Zoning Bylaw Compliance
Provincial
TSSA – Technical  Standards and Safety Authority
TSSA Application for a Consultation
TSSA Application for License to Operate a Refuelling Station
TSSA Application for Operating Engineers Registration
TSSA Application for a Variance
ESA – Electrical Safety Authority Plan Review
Ministry of the Environment, Conservation and Parks
Noise Screening Report
MOL – Ministry of Labour
Pre-Start Health and Safety Review
MOL Notice of Project
MTO – Ministry of Transportation
Federal
Measurement Canada
Transport Canada
Utilities
Utilities
Electric
Internet
Telephone
EQUIPMENT SPECIFICATIONS
Compressor
H2 Station Equipment: All Equipment
Gas / Air Heat Exchanger
Gas Control Panels
Fill Posts
Power Control Communications Panel
Fuel Management System
Tube Trailers
INSTALLATION SPECIFICATIONS
Installation Drawings
GEOTECHNICAL REPORTS
FACTORY ACCEPTANCE TESTS
DRAWINGS
Heat Transfer Calculations
ENGINEERING DOCUMENTATION REQUIRED CHECKLIST