CNG DESIGN STANDARD
cng TEMPLATE
INTEGRATED MANAGEMENT SYSTEM
Project Development Plan
Project Administration Plan
Design Management Procedures
Safety Management System
Emergency Response Plan
Construction Management Plan
Facility Operations Plan
Legal Survey
Mechanical
Civil
Structural
Electrical
Equipment
Installation
DMP-900 Drawings
Drawing Packages Submitted
Concepts
Conceptual Layouts
FEED
Front End Engineering Design (FEED) Report Drawings
IFA
Issued for Approval TSSA Drawing Package (Dated ……………)
IFT
Issued for Tender Drawing Package (Dated…………)
IFC
Issued for Construction Drawing Package (Dated…………)
IFC EU
Issued for Construction – Engineer’s Updates (Dated…………)
AB
As Built Drawing Package (Dated ……………)
Legal Survey
by
LS-100
Legal Survey
Mechanical
by Change Energy Services Inc.
G-100
Title Page
G-101
Mechanical Legend and General Notes
G-200
Site General Arrangement
G-201
Site Elevations
G-202
Site Isometric
M-100
Mechanical Site Plan
M-101
Equipment Compound General Arrangement
M-102
Dispensing and Defuelling Island General Arrangement
M-103
Indoor Dispensing At Fuelling Room General Arrangement
M-110
Signage
M-210
Site P&ID
M-211
Refuel Gas Control Panel P&ID
M-212
Defuel Gas Control Panel P&ID
M-213
Refuelling Room ESD Control Panel P&ID
M-214
Instrument Air P&ID
M-220
Line List
M-221
Design Calculations
M-230
Component List – Sheet 1 of 5
M-231
Component List – Sheet 2 of 5
M-232
Component List – Sheet 3 of 5
M-233
Component List – Sheet 4 of 5
M-234
Component List – Sheet 5 of 5
M-235
Refuelling Room ESD Gas Control Panel Component List
M-236
Safety Station #1 and Safety Station #2 Component List
M-237
Instrument Air Component List
M-300
Mechanical Connection Details
M-400
Miscellaneous Sections and Details
M-401
Typical Pipe and Tube Attachment Details
M-500
Electrically Classified Zones – Plans
M-510
Electrically Classified Zones – Elevations
Civil
by
C-100
Equipment Compound Surface Treatment and Area Calculations
Structural
by
S-100
Structural General Notes and Details
S-200
Structural Plans, Sections and Details
S-300
Structural Pipe Support, Sections and Details
Electrical
by
E-100
Electrical Legend
E-101
Electrical Construction Notes
E-200
Single Line Diagram – Switchgear – 600v
E-201
Single Line Diagram – Power Distribution 1 of 2
E-202
Single Line Diagram – Power Distribution 2 of 2
E-300
GH2 Compound – Electrical Layout
E-301
Electrical Layout – Elevation Details
E-302
Fuelling Room – Electrical Layout Drawing
E-400
PCCM Building Layout
E-401
PCCM Elevation Details
E-500
Grounding and Bonding Layout
E-600
Cable Block Diagram – Sheet 1 of 2
E-601
Cable Block Diagram – Sheet 2 of 2
E-700
Cable and Conduit Schedule – Sheet 1 of 3
E-701
Cable and Conduit Schedule – Sheet 2 of 3
E-702
Cable and Conduit Schedule – Sheet 3 of 3
E-703
Panel Schedules – PCCM BLDG
E-900
Electrical Installation Details – Conduit
E-901
Electrical Installation Details – Grounding
E-902
Electrical Installation Details – Cable Tray Grounding
E-903
Electrical Installation Details – Cable Tray 1
E-904
Electrical Installation Details – Cable Tray 2
Equipment
by Others
DMP-501
Compressor
DMP-502
Gas / Air Heat Exchanger
DMP-503
Gas Control Panels
DMP-504
Fill Posts
DMP-505
Power Control Communications Panel
DMP-506
Fuel Management System
Installation
by Others
DMP-601
Installation Drawings