DETAILED DESIGN DATA SHEETS
Tube Trailer Filling Station Detailed Design Data Sheets
Decanting Station Detailed Design Data Sheets
Vehicle Refuelling Station Detailed Design Data Sheets
STATEMENT OF OWNER’S REQUIREMENTS
DESIGN BASIS MEMORANDUM
PROCESS CONTROL NARRATIVE
COMPRESSIBILITY FACTOR (Z) TABLES
CHANGE CONTROL (SEE SMS-300)
TECHNICAL STANDARD DEVIATION REQUEST
SAFETY ANALYSES
Hazard Identification & Risk Assessment (HIRA)
HIRA Action Items
Failure Mode Effect Analysis (FMEA)
Computational Fluid Dynamics (CFD)
Safety  Instrumented System (SIS)
CSA B51 Code Compliance Checklist
CSA B401.1 Facility Gap Analysis
CSA B108 Code Compliance Checklist
CSA-ANSI B149.6 Gap Analysis
TSSA-DLB Gap Analysis
Reserved for GH2 Codes
Protective Device Coordination Study and Arc Flash Report
APPROVALS
Public
Building Permits
Utilities
Site Plan Control
Zoning Bylaw Compliance
Sign Permits
TSSA – Technical  Standards and Safety Authority
Application for an Ontario Licence to Operate
Application for an Ontario Licence to Operate – Modification
Application for Certificate of Registration of a Plant
ESA – Electrical Safety Authority Plan Review
MECP – Ministry of the Environment, Conservation and Parks
Noise Screening Report
MOL – Ministry of Labour
Pre-Start Health and Safety Review
MOL Notice of Project
MTO – Ministry of Transportation
Measurement Canada
Transport Canada
EQUIPMENT SPECIFICATIONS
Compressor
Gas / Air Heat Exchanger
Gas Control Panels
Fill Posts
Power Control Communications Panel
Fuel Management System
INSTALLATION SPECIFICATIONS
Installation Drawings
GEOTECHNICAL REPORTS
FACTORY ACCEPTANCE TESTS
DRAWINGS
Process and Mechanical Design Calculations
ENGINEERING DOCUMENTATION REQUIRED CHECKLIST