PROJECT INITIATION
PDP Correspondence
Mutual Non-Disclosure Agreement
Scope of Work
Quote
P.O. / Contract
Schedule to P.O.
PROJECT DEFINITION
Conceptual Design Data Sheets (Production, Decanting, Vehicle Refuelling)
Property Evaluation Checklist – Now included in Issues Tracking c/w Property Evaluation (link below)
TRIPLE BOTTOM LINE ASSESSMENT
GH2 Bulk Transport Feasibility Assessment or Gap Analysis
GH2 Vehicle Refuelling Feasibility Assessment or Gap Analysis
GH2 Repair Garage Feasibility Assessment or Gap Analysis
GH2 Parking Garage Feasibility Assessment or Gap Analysis
FRONT END ENGINEERING DESIGN REPORT
GH2 Bulk Transport FEED Report
GH2 Vehicle Refuelling FEED Report
GH2 Production FEED Report
GH2 Decanting FEED Report